• tricerotops [they/them]@hexbear.net
      link
      fedilink
      English
      arrow-up
      28
      ·
      2 days ago

      this has been a right wing talking point the entire time because the first operational stretch will be between central valley cities while they build out the links to SF and LA.

      • sewer_rat_420 [he/him, any]@hexbear.net
        link
        fedilink
        English
        arrow-up
        10
        ·
        2 days ago

        The initial stretch, connecting Bakersfield to Merced, would connect well with existing rail service to the bay area anyway. Sure, the last portion of your leg is on a not high speed train, but the trains in the bay area are decent, Caltrain has had big improvements in recent years